top of page

Projects

VALVE AUTOMATION

  • PLC Controlled

  • Stainless Steel Containment

  • XLPE SWA Cable, YY Control Cable, Part 1 Type 1 Cable and Nylon Airline

  • Profibus Network

  • 31 Auto-Valves

  • 7 Instruments

  • 4 Yeast Purge Pumps

GAS DETECTION SYSTEMS

  • Gas Monitoring Panel

  • Stainless Steel and Galvanised Containment

  • YY Control Cable  and SY Cable

  • 16 LED Flashing Light Effect Beacon,

  • 4 Red Sounder Beacons

  • 7 Green Flashing Green Beacons

  • 7 ‘Do Not Enter Signs’ 

BREWHOUSE UPGRADE

  • Existing Distribution Board, Control Panel and Solenoid Panel

  • Stainless Steel Containment

  • XLPE SWA Cable, YY Control Cable, Part 1 Type 1 Cable and Nylon Airline

  • 21 Auto Valves, 4 Control Valves, 3 Flow Transmitters2 Level Switch and 7 Temperature Transmitters 

  • Agitator Motor

  • Discharge Pump and Scavenge Pump

LOW ENERGY LED LIGHTING

  • New Distribution Board

  • Galvanised Containment

  • XLPE SWA Cable

  • 30 no. Corrosion Proof  LED lights,

  • 30 no.240V 3 Pin Plug and Socket

  • 5 no. Non-Maintained Twin Spot Emergency Lights

  • 2 Maintained Emergency Exit Lights. 

TANK LEVEL MEASUREMENT

  • Existing Control Panels

  • COMbrick Modules

  • Galvanised Containment

  • Profibus PA Cable

  • 120 Level Transmitters

  • 4 no. cat5e Network Points

PACKAGING LIGHTING

  • Existing Distribution Boards

  • Stainless Steel and Galvanised Containment

  • XLPE SWA Cable

  • 6 no. 6 ft LED IP65 Corrosion Proof Light Fittings

  • 24 no. 5FT LED IP65 Corrosion Proof Light Fittings

  • 4 no.Flow Bay Light Fittings

  • 7 no. 50 Watt LED Flood Lights

bottom of page